Case Study - Local, State & Federal
Permitting for Reservoir Dredging
Click on image to view larger size.

This complex project involved dredging of approximately 1.4 million cubic yards of bottom sediment from a public supply reservoir in an area under a state water emergency status. Tasks included complete environmental permitting, project design and monitoring, and construction oversight.

Extensive permitting required the cooperative reviews and approvals from multiple public agencies, including the Conservation Commissions from the respective municipalities, several bureaus within the MA Department of Environmental Protection, and the U.S. Army Corps of Engineers, U.S. EPA and U.S. Fish and Wildlife Service.

CEI is experienced in comprehensive water supply permitting including:
  • Water Management Act

  • Interbasin Transfer Act

  • ACOE Permitting Act

  • NEPA/MEPA Filings

  • 401/c.91 Permits

  • NOI Preparation

Highlights

  • Complete project design and specifications

  • Comprehensive local, state, and federal permitting

  • Multiple Final Order of Conditions - Braintree and Randolph Conservation Commissions

  • Wetland resource area delineations

  • MA DEP 401 Water Quality Certification

  • ACOE 404 Individual Permit - Army Corps of Engineers

  • ENF Filing, MEPA Unit

  • Preliminary EIR communication and alternatives analysis report resulting in MEPA project waiver for mandatory EIR

  • Stormwater management plan

  • Design and sequencing plan

Elements

  • Federal, State and Local Permitting

  • Water Supply Engineering

  • Plans/Specifications

  • Construction Oversight

  • Multi-Agency Coordination


 | email CEIContact Us  | print this pagePrint this Page  | add page to your favoritesAdd to your Favorites  | 

Legal (Use & Copyright Information)
©2005 Comprehensive Environmental Inc


valid css    valid html 4.01    registered with icra