This project involved conducting a Phase II (Level II) Site Characterization to evaluate the nature and extent of contamination migrating from an industrial site towards a Potentially Productive Aquifer, as well as preparation of a Release Abatement Measure Plan to implement the remedial action. Additionally, the project included completion of a Phase III Feasibility Study and a Phase IV Remedial Implementation Plan, with Phase V Operation and Monitoring.
Highlights
- Installation of monitoring wells and conducting of insitu hydraulic conductivity tests
- Use of hydrogeologic tests to develop flow rates and treatment requirements
- Completion of 250' long x 33' deep interceptor trench with central recovery well
- Design and installation of groundwater collection and treatment system
- Development of a Sampling and Analytical Plan and a soils/materials handling protocol approved by DEP
- Implementation of source control for 94 tons of RCRA waste
- Expansion of the treatment system for additional polishing and softening with the water being used as internal plant process cooling water - saving the company over 2 million gallons per year in municipal water usage
- Computer - Remote System Monitoring Control
Elements
- Remediation Design
- Treatment Installation
- Remote System Monitoring
- MCP Filings/AUL
- Sampling/Monitoring for Redevelopment